The air system that keeps each cleanroom grade clean: filtered supply, pressure differences between grades, airflow patterns, and the qualification and requalification that show it works.

What this page does not claim

An equipment family page teaches how a kind of equipment works and how it is assured. It is not a qualification of any site’s equipment, sets no universal limits, and was checked by SPEQ against the sources it lists, not by an independent engineer.

WHAT IT DOES

The heating, ventilation and air-conditioning system supplies filtered air to each room so that it "maintains a positive pressure and/or an airflow relative to the background environment of a lower grade under all operational conditions and should flush the area effectively" (Annex 1, 4.14). Air moves from cleaner to less clean areas, never the other way.

Annex 1 sets four grades, A to D (4.4), and gives a guidance value of "a minimum of 10 Pascals" between adjacent rooms of different grades (4.14). Where unidirectional airflow protects exposed product, it gives a guidance air speed range at the working position and asks for airflow visualisation to correlate with it (4.30).

Where it sits: Around every controlled space: airlocks and change rooms, preparation, filling, and the background rooms of RABS and isolators.

WHERE YOU FIND IT

  • Sterile manufacturing suites
  • Aseptic filling rooms and their backgrounds
  • Change rooms and airlocks
  • Sterility testing laboratories

In the reference facility: Plant utilities, HVAC & energy centre, Processing & formulation suite, Aseptic filling & isolator line, Personnel gowning & change, Material staging, weighing & dispensing

Not covered on this page: Containment design for potent, pathogenic or radioactive materials, where Annex 1 4.14 allows modified pressure regimes; Non-sterile manufacturing areas.

MAJOR COMPONENTS

  • Air handling units (fans, coils, humidifiers). Condition and move the air: temperature, humidity and volume.
  • Pre-filters and terminal HEPA filters. Clean the supply air; the terminal filter is the last barrier before the room. See the HEPA filtration page.
  • Supply and return ductwork, diffusers and low-level returns. Set the airflow pattern in the room.
  • Pressure control dampers. Hold each room at its pressure relative to its neighbours.
  • Airlocks and pass-through hatches. Separate grades; Annex 1 asks for interlocked doors on airlocks into grade A and B (4.13).
  • Building management or environmental monitoring system. Displays pressure differences and raises alarms (Annex 1, 4.16).

Connects to: Isolators, RABS and unidirectional airflow units in the room; Chilled water, steam and power; Environmental monitoring programme; Gowning and material flow procedures.

INSTRUMENTS AND WHAT THEY MEASURE

  • Differential pressure transmitter. Pressure differences between rooms and grades, fitted as indicators between cleanrooms (Annex 1, 4.16). Watch for: ports connected the wrong way round, reversing the sign.
  • Airflow velocity probe (anemometer). Air speed at the working position under unidirectional airflow. Watch for: readings taken at a different height from the one qualified.
  • Optical particle counter. Total particles ≥0.5 µm and ≥5 µm for classification and monitoring. Watch for: sample tubing long or bent enough to lose large particles.
  • Active air sampler and settle plates. Viable contamination in air and on surfaces. Watch for: media dried out over long exposures.
  • Temperature sensor (RTD or thermocouple). Room temperature. Watch for: sensor not at the location that matters (cold spot, load centre).
  • Humidity sensor. Room humidity. Watch for: condensation or peroxide exposure shifting the sensor.

PARAMETERS

SETPOINT · MEASURED · LIMIT · ATTRIBUTE
  • Pressure differential (limit, Pa). Between adjacent rooms of different grades; Annex 1 guidance value of at least 10 Pa (4.14), with the site’s own limits set in qualification.
  • Airflow velocity (measured, m/s). At the working position under unidirectional airflow; Annex 1 guidance range 0.36–0.54 m/s unless scientifically justified in the CCS (4.30).
  • Airborne particle concentration (limit, particles/m³ per size channel). By grade and state, for classification against Annex 1 Table 1 in qualification; the site sets its monitoring limits in a separate programme (4.24).
  • Viable airborne contamination (limit, CFU/m³ or CFU/plate per exposure). By grade during qualification, against Annex 1 Table 2 (4.31).
  • Recovery (clean-up) time (measured, min). Determined in qualification; guidance value under 20 minutes (Annex 1, 4.29).
  • Supply airflow volume (measured, m³/h). At each supply filter, part of qualification and requalification (4.25, 4.32).

SPEQ publishes no universal alarm or acceptance values: they depend on the process, the product and the site’s own qualification.

CONTROLS, ALARMS AND INTERLOCKS

  • Control loop: Room pressure control. Adjusts supply or exhaust to hold each room’s differential.
  • Alarm: Pressure difference out of range. Warns operators at once of a supply failure or a critical difference below its limit; it is not overridden without assessment, and any alarm delay is justified in the CCS (Annex 1, 4.16).
  • Interlock: Airlock door interlocks. Stop both doors of an airlock into grade A or B opening at once (Annex 1, 4.13).
  • Procedure: Requalification schedule. Grade A and B at most every 6 months, grade C and D at most every 12 months, and after significant change (Annex 1, 4.32).

An alarm asks for a response; an interlock stops an action; a safety function protects people and has its own risk basis.

HOW IT FAILS

  • Loss or reversal of pressure difference. Air from a lower grade can enter a cleaner room.
  • Turbulence or air moving over people or equipment into the critical zone. Contamination carried to exposed product; Annex 1 asks visualisation to show it does not happen (4.15).
  • Filter or seal leak. Unfiltered air enters the room downstream of the filter.
  • Airlock doors opened together. Grades mix during transfer.
  • Change to equipment or layout without review. Airflow patterns and pressures change from what was qualified.

ASSURANCE ACROSS THE LIFECYCLE

EXAMPLES, NOT A MANDATORY LIST
  • Design. User requirements by grade; Airflow and pressure cascade design; Contamination control strategy (CCS) input.
  • Qualification (Annex 15; Annex 1, 4.25). Installed filter leakage and integrity; Airflow volume and velocity; Pressure difference; Airflow direction and visualisation; Microbial contamination; Temperature and humidity; Recovery.
  • Classification (Annex 1, 4.26–4.29). Particles ≥0.5 and ≥5 µm, at rest and in simulated operation; Sampling locations per ISO 14644-1, plus critical points such as the point of fill.
  • Routine. Pressure difference records and alarms; Environmental monitoring results and trends.
  • Requalification and change. Periodic requalification to Annex 1, 4.32; Requalification after remedial action or significant change.

WHAT THIS DOES NOT PROVE

  • A room that meets its pressure differences does not prove air does not move over operators into the critical zone. Instead: Airflow visualisation in operation (Annex 1, 4.15).
  • Classification at rest does not prove the room stays clean in operation. Instead: In-operation classification and routine monitoring.
  • A high air-change rate does not prove the room is clean enough. Instead: Particle and viable results by location, and recovery testing.

SOURCES

5 CITED

HOW THIS PAGE WAS CHECKED

Researched and checked against the sources above by SPEQ (Claude) on 2026-10-21. It has not been reviewed by an independent engineer. It teaches how this kind of equipment works and is assured; it does not say any site, asset or process is qualified, validated or compliant.

  • Figures quoted here are Annex 1 guidance values; FDA’s 2004 guidance sets its own US expectations, not quoted here.

Spotted something wrong? Tell us.