Factory Acceptance Test (FAT) Protocol
FAT protocol template for verifying equipment at the vendor works before shipment — prerequisites, functional and performance test matrix, the documentation-review checklist that makes FAT results leverageable in C&Q, punch-list disposition, and formal acceptance.
What a template is not
A template is a document baseline to adapt inside your own quality system. SPEQ does not approve, validate, or take responsibility for what you issue from it, and using one is not evidence of compliance.
The protocol that verifies equipment at the vendor before it ships, and — through a documentation review as rigorous as the testing — makes those results usable later instead of repeated on site. The characteristic failure is a FAT executed well and documented loosely, so nothing survives the journey. Whether vendor testing may be leveraged rather than repeated is your organisation’s determination, made against your own risk assessment.
What's Inside
How to Use It
The full section structure of this template — every section and sub-section, so you can use it as a baseline for your own site document.
ASTM E2500-25 and the ISPE Baseline Guide Vol. 5 (2nd ed.) allow well-documented vendor testing to be leveraged as verification evidence rather than repeated, which is why the documentation review carries as much weight as the tests. For automation and computerised elements, GAMP 5 (2nd ed.) supplies the lifecycle that vendor evidence has to fit. None of them decides whether a particular vendor’s testing is good enough to rely on — that assessment, and its consequences, stay with your organisation.